Average Switching Time per Stage Solution

STEP 0: Pre-Calculation Summary
Formula Used
Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage
Tst = (Tcs-Tother)/K
This formula uses 4 Variables
Variables Used
Average Switching Time per Stage - (Measured in Second) - Average Switching Time per Stage refers to the average time it takes for a signal or data to traverse through one stage or element of a switching system.
Call Setup Time - (Measured in Second) - Call Setup Time refers to the duration it takes for a call or communication session to be established and ready for communication between the calling and receiving parties.
Time Required Other than Switching - (Measured in Second) - Time required other than switching refers to the duration or time spent on tasks or processes that are not directly related to the switching operation itself.
Number of Switching Stage - Number of Switching Stages refers to the count or quantity of stages or levels involved in the switching process within a particular switching system or network.
STEP 1: Convert Input(s) to Base Unit
Call Setup Time: 0.353 Second --> 0.353 Second No Conversion Required
Time Required Other than Switching: 0.11 Second --> 0.11 Second No Conversion Required
Number of Switching Stage: 3 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Tst = (Tcs-Tother)/K --> (0.353-0.11)/3
Evaluating ... ...
Tst = 0.081
STEP 3: Convert Result to Output's Unit
0.081 Second --> No Conversion Required
FINAL ANSWER
0.081 Second <-- Average Switching Time per Stage
(Calculation completed in 00.004 seconds)

Credits

Created by Shobhit Dimri
Bipin Tripathi Kumaon Institute of Technology (BTKIT), Dwarahat
Shobhit Dimri has created this Calculator and 900+ more calculators!
Verified by Urvi Rathod
Vishwakarma Government Engineering College (VGEC), Ahmedabad
Urvi Rathod has verified this Calculator and 1900+ more calculators!

15 Digital Switching System Calculators

Maximum Variation Resistance by Carbon Granules
Go Maximum Variation in Resistance = (Quiescent Resistance-Instantaneous Resistance)/sin(Angular Frequency*Time Period)
Quiescent Resistance of Microphone
Go Quiescent Resistance = Instantaneous Resistance+Maximum Variation in Resistance*sin(Angular Frequency*Time Period)
Instantaneous Resistance of Microphone
Go Instantaneous Resistance = Quiescent Resistance-Maximum Variation in Resistance*sin(Angular Frequency*Time Period)
Number of Switching Elements
Go Number of Switching Element = (Cost of Switching System-Cost of Common Hardware-Cost of Common Control System)/Cost per Switching Element
Average Switching Time per Stage
Go Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage
Number of Switching Stage
Go Number of Switching Stage = (Call Setup Time-Time Required Other than Switching)/Average Switching Time per Stage
Switching Element Advantage Factor
Go Switching Element Advantage Factor = Number of SE in Single Switch/Number of SE in Equivalent Multistage
Number of SE in Equivalent Multistage
Go Number of SE in Equivalent Multistage = Number of SE in Single Switch/Switching Element Advantage Factor
Number of SE in Single Switch
Go Number of SE in Single Switch = Number of SE in Equivalent Multistage*Switching Element Advantage Factor
Theoretical Maximum Load
Go Number of Subscriber Lines = (2*Switching Capacity)/Traffic Handling Capacity
Number of SE when SC Fully Utilised
Go SE when SC Fully Utilized = Total Number of SE*Equipment Utilization Factor
Total Number of SE in System
Go Total Number of SE = SE when SC Fully Utilized/Equipment Utilization Factor
Equipment Utilization Factor
Go Equipment Utilization Factor = SE when SC Fully Utilized/Total Number of SE
Power Ratio
Go Power Ratio = 20*log10(Voltage2/Voltage1)
Sinusoidal Input
Go Sinusoidal Input = Quantization Error*2*Voltage

Average Switching Time per Stage Formula

Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage
Tst = (Tcs-Tother)/K

What does Call Setup Time means?

Call Setup Time for data communication, the overall length of time required to establish a circuit-switched call between terminals; i.e., the time from the initiation of a call request to the beginning of the call message.

How to Calculate Average Switching Time per Stage?

Average Switching Time per Stage calculator uses Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage to calculate the Average Switching Time per Stage, Average Switching Time per Stage refers to the average duration it takes for a switch or switching operation to be completed within the system. It represents the time it takes for the system to process and route a call or communication session from its initiation to its desired destination. Average Switching Time per Stage is denoted by Tst symbol.

How to calculate Average Switching Time per Stage using this online calculator? To use this online calculator for Average Switching Time per Stage, enter Call Setup Time (Tcs), Time Required Other than Switching (Tother) & Number of Switching Stage (K) and hit the calculate button. Here is how the Average Switching Time per Stage calculation can be explained with given input values -> 0.081 = (0.353-0.11)/3 .

FAQ

What is Average Switching Time per Stage?
Average Switching Time per Stage refers to the average duration it takes for a switch or switching operation to be completed within the system. It represents the time it takes for the system to process and route a call or communication session from its initiation to its desired destination and is represented as Tst = (Tcs-Tother)/K or Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage. Call Setup Time refers to the duration it takes for a call or communication session to be established and ready for communication between the calling and receiving parties, Time required other than switching refers to the duration or time spent on tasks or processes that are not directly related to the switching operation itself & Number of Switching Stages refers to the count or quantity of stages or levels involved in the switching process within a particular switching system or network.
How to calculate Average Switching Time per Stage?
Average Switching Time per Stage refers to the average duration it takes for a switch or switching operation to be completed within the system. It represents the time it takes for the system to process and route a call or communication session from its initiation to its desired destination is calculated using Average Switching Time per Stage = (Call Setup Time-Time Required Other than Switching)/Number of Switching Stage. To calculate Average Switching Time per Stage, you need Call Setup Time (Tcs), Time Required Other than Switching (Tother) & Number of Switching Stage (K). With our tool, you need to enter the respective value for Call Setup Time, Time Required Other than Switching & Number of Switching Stage and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!