Basic setup time given Non-productive time in turning Solution

STEP 0: Pre-Calculation Summary
Formula Used
Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool)
tsa = (NPT-tln-(tpt*n0))*Nb-(Nt*tsb)
This formula uses 8 Variables
Variables Used
Basic Setup Time - (Measured in Second) - Basic Setup Time is the basic time required to load/unload the workpiece and position the tool for production for one component.
Non-Productive Time - (Measured in Second) - Non-Productive Time is the total time wasted in setting up the machine or workpiece for a particular process.
Loading and Unloading Time - (Measured in Second) - Loading and Unloading time is the time required to load/unload the workpiece before the start of machine operation.
Tool Positioning Time per Operation - (Measured in Second) - Tool Positioning Time per Operation is defined as the time taken in changing the tool before the start of operation.
Number of Operations - The Number of Operations is defined as the total number of operations done in a batch.
Batch Size - Batch Size is the count of similar kinds of products to be manufactured.
Number of Tools Used - The Number of Tools Used is the total number of tools used for manufacturing a batch of products.
Setup Time per Tool - (Measured in Second) - Setup time per tool is defined as the amount of time taken in setting up the tool while maching.
STEP 1: Convert Input(s) to Base Unit
Non-Productive Time: 20 Minute --> 1200 Second (Check conversion here)
Loading and Unloading Time: 0.5 Minute --> 30 Second (Check conversion here)
Tool Positioning Time per Operation: 1.5 Minute --> 90 Second (Check conversion here)
Number of Operations: 4 --> No Conversion Required
Batch Size: 3 --> No Conversion Required
Number of Tools Used: 2 --> No Conversion Required
Setup Time per Tool: 10 Minute --> 600 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
tsa = (NPT-tln-(tpt*n0))*Nb-(Nt*tsb) --> (1200-30-(90*4))*3-(2*600)
Evaluating ... ...
tsa = 1230
STEP 3: Convert Result to Output's Unit
1230 Second -->20.5 Minute (Check conversion here)
FINAL ANSWER
20.5 Minute <-- Basic Setup Time
(Calculation completed in 00.004 seconds)

Credits

Created by Parul Keshav
National Institute of Technology (NIT), Srinagar
Parul Keshav has created this Calculator and 300+ more calculators!
Verified by Rajat Vishwakarma
University Institute of Technology RGPV (UIT - RGPV), Bhopal
Rajat Vishwakarma has verified this Calculator and 400+ more calculators!

10+ Turning Calculators

Batch size given Non-productive time in turning
Go Batch Size = (Basic Setup Time+Number of Tools Used*Setup Time per Tool)/((Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations)))
Tool positioning time per operation given Non-productive time in turning
Go Tool Positioning Time per Operation = (Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time per Tool)/Batch Size)-Loading and Unloading Time)/Number of Operations
Loading and unloading time given Non-productive time in turning
Go Loading and Unloading Time = Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time per Tool)/Batch Size)-(Tool Positioning Time per Operation*Number of Operations)
Set-up Time per tool terms of Non-productive time in turning
Go Setup Time per Tool = ((Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-Basic Setup Time)/Number of Tools Used
Number of operations given Non-productive time in turning
Go Number of Operations = (Non-Productive Time-((Basic Setup Time+Number of Tools Used*Setup Time per Tool)/Batch Size)-Loading and Unloading Time)/Tool Positioning Time per Operation
Basic setup time given Non-productive time in turning
Go Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool)
Number of tools given Non-productive time in turning
Go Number of Tools Used = ((Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-Basic Setup Time)/Setup Time per Tool
Non-productive time in turning
Go Non-Productive Time = ((Basic Setup Time+Number of Tools Used*Setup Time per Tool)/Batch Size)+Loading and Unloading Time+(Tool Positioning Time per Operation*Number of Operations)
Diameter of turned parts given Length-to-diameter Ratio
Go Diameter of Workpiece = (1.67/Length to Diameter Ratio)^(1/0.68)
Length-to-diameter Ratio given diameter of turned parts
Go Length to Diameter Ratio = 1.67/(Diameter of Workpiece^0.68)

Basic setup time given Non-productive time in turning Formula

Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool)
tsa = (NPT-tln-(tpt*n0))*Nb-(Nt*tsb)

What is the difference between turning and facing operations?

In the turning operation, the tool generally reduces the diameter of the cylindrical workpiece, which can be done by cutting into the part for some depth and move the tool parallel to the axis of the part. While facing operation reduces the length of the piece, the tool is moved perpendicular to the axis of the part.

How to Calculate Basic setup time given Non-productive time in turning?

Basic setup time given Non-productive time in turning calculator uses Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool) to calculate the Basic Setup Time, The Basic setup time given Non-productive time in turning is the basic time required to load/unload the workpiece and position the tool for production for one component. Basic Setup Time is denoted by tsa symbol.

How to calculate Basic setup time given Non-productive time in turning using this online calculator? To use this online calculator for Basic setup time given Non-productive time in turning, enter Non-Productive Time (NPT), Loading and Unloading Time (tln), Tool Positioning Time per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Number of Tools Used (Nt) & Setup Time per Tool (tsb) and hit the calculate button. Here is how the Basic setup time given Non-productive time in turning calculation can be explained with given input values -> 0.341667 = (1200-30-(90*4))*3-(2*600).

FAQ

What is Basic setup time given Non-productive time in turning?
The Basic setup time given Non-productive time in turning is the basic time required to load/unload the workpiece and position the tool for production for one component and is represented as tsa = (NPT-tln-(tpt*n0))*Nb-(Nt*tsb) or Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool). Non-Productive Time is the total time wasted in setting up the machine or workpiece for a particular process, Loading and Unloading time is the time required to load/unload the workpiece before the start of machine operation, Tool Positioning Time per Operation is defined as the time taken in changing the tool before the start of operation, The Number of Operations is defined as the total number of operations done in a batch, Batch Size is the count of similar kinds of products to be manufactured, The Number of Tools Used is the total number of tools used for manufacturing a batch of products & Setup time per tool is defined as the amount of time taken in setting up the tool while maching.
How to calculate Basic setup time given Non-productive time in turning?
The Basic setup time given Non-productive time in turning is the basic time required to load/unload the workpiece and position the tool for production for one component is calculated using Basic Setup Time = (Non-Productive Time-Loading and Unloading Time-(Tool Positioning Time per Operation*Number of Operations))*Batch Size-(Number of Tools Used*Setup Time per Tool). To calculate Basic setup time given Non-productive time in turning, you need Non-Productive Time (NPT), Loading and Unloading Time (tln), Tool Positioning Time per Operation (tpt), Number of Operations (n0), Batch Size (Nb), Number of Tools Used (Nt) & Setup Time per Tool (tsb). With our tool, you need to enter the respective value for Non-Productive Time, Loading and Unloading Time, Tool Positioning Time per Operation, Number of Operations, Batch Size, Number of Tools Used & Setup Time per Tool and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.