Compaction Production by Compaction Equipment when Efficiency Factor is Excellent Solution

STEP 0: Pre-Calculation Summary
Formula Used
Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes
y = (16*W*S*L*PR*0.90)/P
This formula uses 6 Variables
Variables Used
Production Due to Compaction - (Measured in Cubic Meter per Second) - Production Due to Compaction is the exertion of force on something so that it becomes more dense.
Width of Roller - (Measured in Meter) - Width of Roller is the smaller dimension of the roller .
Roller Speed - (Measured in Meter per Second) - Roller speed is the speed by which the roller is rolling over the surface.
Lift Thickness - (Measured in Meter) - Lift Thickness governs aggregate size.
Pay Ratio - (Measured in Cubic Meter) - Pay Ratio to loose in soil compaction.
Number of Passes - Number of Passes required to obtain the required compaction depends on the lift thickness, contact pressure, and soil moisture content.
STEP 1: Convert Input(s) to Base Unit
Width of Roller: 2.89 Meter --> 2.89 Meter No Conversion Required
Roller Speed: 3 Kilometer per Hour --> 0.833333333333333 Meter per Second (Check conversion here)
Lift Thickness: 2 Millimeter --> 0.002 Meter (Check conversion here)
Pay Ratio: 2.99 Cubic Meter --> 2.99 Cubic Meter No Conversion Required
Number of Passes: 5 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
y = (16*W*S*L*PR*0.90)/P --> (16*2.89*0.833333333333333*0.002*2.99*0.90)/5
Evaluating ... ...
y = 0.04147728
STEP 3: Convert Result to Output's Unit
0.04147728 Cubic Meter per Second -->149.318208 Cubic Meter per Hour (Check conversion here)
FINAL ANSWER
149.318208 149.3182 Cubic Meter per Hour <-- Production Due to Compaction
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

10+ Compaction Equipment Calculators

Thickness of Lift given Compaction Production by Compaction Equipment
Go Lift Thickness = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Efficiency Factor*Roller Speed)
Ratio of Pay to Loose using Compaction Production by Compaction Equipment
Go Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
Efficiency Factor using Compaction Production by Compaction Equipment
Go Efficiency Factor = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio)
Width of Roller given Compaction Production by Compaction Equipment
Go Width of Roller = (Production Due to Compaction*Number of Passes)/(16*Roller Speed*Lift Thickness*Pay Ratio*Efficiency Factor)
Speed of Roller given Compaction Production by Compaction Equipment
Go Roller Speed = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Lift Thickness*Pay Ratio*Efficiency Factor)
Number of Passes given Compaction Production by Compaction Equipment
Go Number of Passes = (16*Width of Roller*Roller Speed*Efficiency Factor*Lift Thickness*Pay Ratio)/Production Due to Compaction
Compaction Production by Compaction Equipment
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor*Pay Ratio)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Excellent
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Average
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.80)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Poor
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.75)/Number of Passes

Compaction Production by Compaction Equipment when Efficiency Factor is Excellent Formula

Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes
y = (16*W*S*L*PR*0.90)/P

What is Compaction?

In geotechnical engineering, soil compaction is the process in which stress is applied to a soil causes densification as air is displaced from the pores between the soil grains.

How to Calculate Compaction Production by Compaction Equipment when Efficiency Factor is Excellent?

Compaction Production by Compaction Equipment when Efficiency Factor is Excellent calculator uses Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes to calculate the Production Due to Compaction, The Compaction Production by Compaction Equipment when Efficiency Factor is Excellent is defined as the amount of compaction done by compacting equipment. Production Due to Compaction is denoted by y symbol.

How to calculate Compaction Production by Compaction Equipment when Efficiency Factor is Excellent using this online calculator? To use this online calculator for Compaction Production by Compaction Equipment when Efficiency Factor is Excellent, enter Width of Roller (W), Roller Speed (S), Lift Thickness (L), Pay Ratio (PR) & Number of Passes (P) and hit the calculate button. Here is how the Compaction Production by Compaction Equipment when Efficiency Factor is Excellent calculation can be explained with given input values -> 558005.8 = (16*2.89*0.833333333333333*0.002*2.99*0.90)/5.

FAQ

What is Compaction Production by Compaction Equipment when Efficiency Factor is Excellent?
The Compaction Production by Compaction Equipment when Efficiency Factor is Excellent is defined as the amount of compaction done by compacting equipment and is represented as y = (16*W*S*L*PR*0.90)/P or Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes. Width of Roller is the smaller dimension of the roller , Roller speed is the speed by which the roller is rolling over the surface, Lift Thickness governs aggregate size, Pay Ratio to loose in soil compaction & Number of Passes required to obtain the required compaction depends on the lift thickness, contact pressure, and soil moisture content.
How to calculate Compaction Production by Compaction Equipment when Efficiency Factor is Excellent?
The Compaction Production by Compaction Equipment when Efficiency Factor is Excellent is defined as the amount of compaction done by compacting equipment is calculated using Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes. To calculate Compaction Production by Compaction Equipment when Efficiency Factor is Excellent, you need Width of Roller (W), Roller Speed (S), Lift Thickness (L), Pay Ratio (PR) & Number of Passes (P). With our tool, you need to enter the respective value for Width of Roller, Roller Speed, Lift Thickness, Pay Ratio & Number of Passes and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Production Due to Compaction?
In this formula, Production Due to Compaction uses Width of Roller, Roller Speed, Lift Thickness, Pay Ratio & Number of Passes. We can use 3 other way(s) to calculate the same, which is/are as follows -
  • Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor*Pay Ratio)/Number of Passes
  • Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.80)/Number of Passes
  • Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.75)/Number of Passes
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!