Maximum Daily Flow for Areas of Moderate Sizes Solution

STEP 0: Pre-Calculation Summary
Formula Used
Maximum Daily Flow = (2*Average Daily Flow)
Qd = (2*Qav)
This formula uses 2 Variables
Variables Used
Maximum Daily Flow - (Measured in Cubic Meter per Second) - Maximum Daily Flow means the greatest volume of water to be discharged.
Average Daily Flow - (Measured in Cubic Meter per Second) - Average Daily Flow means the average of total daily flows measured during any calendar month.
STEP 1: Convert Input(s) to Base Unit
Average Daily Flow: 6 Cubic Meter per Second --> 6 Cubic Meter per Second No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Qd = (2*Qav) --> (2*6)
Evaluating ... ...
Qd = 12
STEP 3: Convert Result to Output's Unit
12 Cubic Meter per Second --> No Conversion Required
FINAL ANSWER
12 Cubic Meter per Second <-- Maximum Daily Flow
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

15 Estimating the Design Sewage Discharge Calculators

Average Daily Sewage Flow given Peak Sewage Flow
Go Average Daily Flow = Peak Sewage Flow/((18+sqrt(Population in Thousands))/(4+sqrt(Population in Thousands)))
Peak Sewage Flow given Population in Thousands
Go Peak Sewage Flow = Average Daily Flow*((18+sqrt(Population in Thousands))/(4+sqrt(Population in Thousands)))
Population in Thousands given Peak Sewage Flow
Go Population in Thousands = ((18*Average Daily Flow-4*Peak Sewage Flow)/(Peak Sewage Flow-Average Daily Flow))^2
Maximum Hourly Flow given Maximum Daily Flow for Areas of Moderate Sizes
Go Maximum Hourly Flow = (1.5*Maximum Daily Flow)
Minimum Hourly Flow given Minimum Daily Flow for Areas of Moderate Sizes
Go Minimum Hourly Flow = (0.5*Minimum Daily Flow)
Minimum Hourly Sewage Flow given Average Daily Flow
Go Minimum Hourly Flow = (1/3)*Average Daily Flow
Average Daily Flow given Minimum Daily Flow for Areas of Moderate Sizes
Go Average Daily Flow = (3/2)*Minimum Daily Flow
Minimum Daily Flow for Areas of Moderate Sizes
Go Minimum Daily Flow = (2/3)*Average Daily Flow
Minimum Daily Sewage Flow given Minimum Hourly Flow
Go Minimum Daily Flow = (2*Minimum Hourly Flow)
Maximum Daily Flow given Maximum Hourly Flow
Go Maximum Daily Flow = Maximum Hourly Flow/1.5
Average Daily Flow given Maximum Hourly Flow
Go Average Daily Flow = (Maximum Hourly Flow/3)
Maximum Hourly Flow given Average Daily Flow
Go Maximum Hourly Flow = (3*Average Daily Flow)
Average Daily Flow given Maximum Daily Flow for Areas of Moderate Sizes
Go Average Daily Flow = (Maximum Daily Flow/2)
Maximum Daily Flow for Areas of Moderate Sizes
Go Maximum Daily Flow = (2*Average Daily Flow)
Average Daily Sewage Flow given Minimum Hourly Flow
Go Average Daily Flow = 3*Minimum Hourly Flow

Maximum Daily Flow for Areas of Moderate Sizes Formula

Maximum Daily Flow = (2*Average Daily Flow)
Qd = (2*Qav)

What is Maximum Daily Flow ?

Maximum Daily Flow means the greatest volume of wastewater to be discharged over an operating day, not to exceed the design flow rate. Maximum Daily Flow means the greatest volume of wastewater that is discharged during a 24 hour period.

How to Calculate Maximum Daily Flow for Areas of Moderate Sizes?

Maximum Daily Flow for Areas of Moderate Sizes calculator uses Maximum Daily Flow = (2*Average Daily Flow) to calculate the Maximum Daily Flow, The Maximum Daily Flow for Areas of Moderate Sizes is defined as the maximum daily flow of wastewater when we have prior information of average daily flow. Maximum Daily Flow is denoted by Qd symbol.

How to calculate Maximum Daily Flow for Areas of Moderate Sizes using this online calculator? To use this online calculator for Maximum Daily Flow for Areas of Moderate Sizes, enter Average Daily Flow (Qav) and hit the calculate button. Here is how the Maximum Daily Flow for Areas of Moderate Sizes calculation can be explained with given input values -> 12 = (2*6).

FAQ

What is Maximum Daily Flow for Areas of Moderate Sizes?
The Maximum Daily Flow for Areas of Moderate Sizes is defined as the maximum daily flow of wastewater when we have prior information of average daily flow and is represented as Qd = (2*Qav) or Maximum Daily Flow = (2*Average Daily Flow). Average Daily Flow means the average of total daily flows measured during any calendar month.
How to calculate Maximum Daily Flow for Areas of Moderate Sizes?
The Maximum Daily Flow for Areas of Moderate Sizes is defined as the maximum daily flow of wastewater when we have prior information of average daily flow is calculated using Maximum Daily Flow = (2*Average Daily Flow). To calculate Maximum Daily Flow for Areas of Moderate Sizes, you need Average Daily Flow (Qav). With our tool, you need to enter the respective value for Average Daily Flow and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
How many ways are there to calculate Maximum Daily Flow?
In this formula, Maximum Daily Flow uses Average Daily Flow. We can use 1 other way(s) to calculate the same, which is/are as follows -
  • Maximum Daily Flow = Maximum Hourly Flow/1.5
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!