Quantity given Production Required Solution

STEP 0: Pre-Calculation Summary
Formula Used
Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour)
Bsp = (Ps*thr)
This formula uses 3 Variables
Variables Used
Bank in Scraper Production - (Measured in Cubic Meter) - Bank in Scraper Production is computed in terms of volume.
Production Required in Scraper Production - (Measured in Cubic Meter per Second) - Production Required in Scraper Production is the amount of scrap produced.
Time in Scraper Production in Hour - (Measured in Second) - Time in Scraper Production in Hour is the continued sequence of existence and events that occurs in an apparently irreversible succession from the past, through the present, into the future in hour.
STEP 1: Convert Input(s) to Base Unit
Production Required in Scraper Production: 75 Cubic Meter per Hour --> 0.0208333333333333 Cubic Meter per Second (Check conversion here)
Time in Scraper Production in Hour: 2.52 Hour --> 9072 Second (Check conversion here)
STEP 2: Evaluate Formula
Substituting Input Values in Formula
Bsp = (Ps*thr) --> (0.0208333333333333*9072)
Evaluating ... ...
Bsp = 189
STEP 3: Convert Result to Output's Unit
189 Cubic Meter --> No Conversion Required
FINAL ANSWER
189 Cubic Meter <-- Bank in Scraper Production
(Calculation completed in 00.004 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Rithik Agrawal
National Institute of Technology Karnataka (NITK), Surathkal
Rithik Agrawal has verified this Calculator and 400+ more calculators!

25 Scraper Production Calculators

Speed at Haul and Return in Miles per Hour given Variable Time
Go Speed in Miles per Hour in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Variable Time in Scraper Production)
Variable Time when Haul and Return Distance is in Feet
Go Variable Time in Scraper Production = (Haul Distance in Feet+Return Distance in Foot in Scraper Production)/(88*Speed in Miles per Hour in Scraper Production)
Return Distance in Feet given Variable Time
Go Return Distance in Foot in Scraper Production = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Haul Distance in Feet
Haul Distance in Feet given Variable Time
Go Haul Distance in Feet = (Variable Time in Scraper Production*88*Speed in Miles per Hour in Scraper Production)-Return Distance in Foot in Scraper Production
Speed at Haul and Return in Kilometer per Hour given Variable Time
Go Speed in Kmph in Scraper Production = (Haul Distance+Return Distance in Meter)/(16.7*Variable Time in Scraper Production)
Return Distance in Meter given Variable Time
Go Return Distance in Meter = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Haul Distance
Haul Distance in Meter given Variable Time
Go Haul Distance = (Variable Time in Scraper Production*16.7*Speed in Kmph in Scraper Production)-Return Distance in Meter
Production Required to Determine Number of Scrapers
Go Production Required in Scraper Production = (Bank in Scraper Production/Time in Scraper Production in Hour)
Working Time given Production Required
Go Time in Scraper Production in Hour = (Bank in Scraper Production/Production Required in Scraper Production)
Quantity given Production Required
Go Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour)
Production Required given Number of Scrapers Needed for Job
Go Production Required in Scraper Production = Number of Scraper in Scraper Production*Production per Unit
Trips per Hour given Production of Scrap by Machines
Go Trips per Hour = (Production Required in Scraper Production/Load in Scraper Production)
Load Given Production of Scrap by Machines
Go Load in Scraper Production = (Production Required in Scraper Production/Trips per Hour)
Production of Scrap by Machines
Go Production Required in Scraper Production = (Load in Scraper Production*Trips per Hour)
Number of Scrapers Needed for Job
Go Number of Scraper = (Production Required in Scraper Production/Production per Unit)
Density of Material given Quantity of Scrap Produced
Go Density of Material in Scraper Production = (Weight of Load Scrap/Bank in Scraper)
Weight of Load Given Quantity of Scrap Produced
Go Weight of Load Scrap = (Bank in Scraper*Density of Material in Scraper Production)
Bank or Quantity of Scrap Produced
Go Bank in Scraper = (Weight of Load Scrap/Density of Material in Scraper Production)
Scraper Cycle Time given Number of Scrapers Pusher can Load
Go Scraper Cycle Time = (Number of Scraper a Pusher*Pusher Cycle Time)
Pusher Cycle Time given Number of Scrapers Pusher can Load
Go Pusher Cycle Time = (Scraper Cycle Time/Number of Scraper a Pusher)
Number of Scrapers Pusher can Load
Go Number of Scraper a Pusher = (Scraper Cycle Time/Pusher Cycle Time)
Working Time given Trips per Hour for Excavating Scrap
Go Working Time in Scraper Production = (Trips per Hour*Cycle Time)
Cycle Time given Trips per Hour for Excavating Scrap
Go Cycle Time = (Working Time in Scraper Production/Trips per Hour)
Trips per Hour for Excavating Scrap
Go Trips per Hour = (Working Time in Scraper Production/Cycle Time)
Production per Unit Given Number of Scrapers Needed for Job
Go Production per Unit = (Production Required/Number of Scraper)

Quantity given Production Required Formula

Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour)
Bsp = (Ps*thr)

What is Scrap Quantity?

Scrap quantity consists of recyclable materials left over from product manufacturing and consumption, such as parts of vehicles, building supplies, and surplus materials. Unlike waste, scrap has monetary value, especially recovered metals, and non-metallic materials are also recovered for recycling.

How to Calculate Quantity given Production Required?

Quantity given Production Required calculator uses Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour) to calculate the Bank in Scraper Production, The Quantity given Production Required is defined as the volume of scrap which will be produced in the working time . Bank in Scraper Production is denoted by Bsp symbol.

How to calculate Quantity given Production Required using this online calculator? To use this online calculator for Quantity given Production Required, enter Production Required in Scraper Production (Ps) & Time in Scraper Production in Hour (thr) and hit the calculate button. Here is how the Quantity given Production Required calculation can be explained with given input values -> 189 = (0.0208333333333333*9072).

FAQ

What is Quantity given Production Required?
The Quantity given Production Required is defined as the volume of scrap which will be produced in the working time and is represented as Bsp = (Ps*thr) or Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour). Production Required in Scraper Production is the amount of scrap produced & Time in Scraper Production in Hour is the continued sequence of existence and events that occurs in an apparently irreversible succession from the past, through the present, into the future in hour.
How to calculate Quantity given Production Required?
The Quantity given Production Required is defined as the volume of scrap which will be produced in the working time is calculated using Bank in Scraper Production = (Production Required in Scraper Production*Time in Scraper Production in Hour). To calculate Quantity given Production Required, you need Production Required in Scraper Production (Ps) & Time in Scraper Production in Hour (thr). With our tool, you need to enter the respective value for Production Required in Scraper Production & Time in Scraper Production in Hour and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.
Let Others Know
Facebook
Twitter
Reddit
LinkedIn
Email
WhatsApp
Copied!