Ratio of Pay to Loose using Compaction Production by Compaction Equipment Solution

STEP 0: Pre-Calculation Summary
Formula Used
Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
PR = (y*P)/(16*W*S*L*E)
This formula uses 7 Variables
Variables Used
Pay Ratio - (Measured in Cubic Meter) - Pay Ratio to loose in soil compaction.
Production Due to Compaction - (Measured in Cubic Meter per Second) - Production Due to Compaction is the exertion of force on something so that it becomes more dense.
Number of Passes - Number of Passes required to obtain the required compaction depends on the lift thickness, contact pressure, and soil moisture content.
Width of Roller - (Measured in Meter) - Width of Roller is the smaller dimension of the roller .
Roller Speed - (Measured in Meter per Second) - Roller speed is the speed by which the roller is rolling over the surface.
Lift Thickness - (Measured in Meter) - Lift Thickness governs aggregate size.
Efficiency Factor - The Efficiency Factor is the relationship between the allowance time and the time taken.
STEP 1: Convert Input(s) to Base Unit
Production Due to Compaction: 150 Cubic Meter per Hour --> 0.0416666666666667 Cubic Meter per Second (Check conversion here)
Number of Passes: 5 --> No Conversion Required
Width of Roller: 2.89 Meter --> 2.89 Meter No Conversion Required
Roller Speed: 3 Kilometer per Hour --> 0.833333333333333 Meter per Second (Check conversion here)
Lift Thickness: 2 Millimeter --> 0.002 Meter (Check conversion here)
Efficiency Factor: 0.5 --> No Conversion Required
STEP 2: Evaluate Formula
Substituting Input Values in Formula
PR = (y*P)/(16*W*S*L*E) --> (0.0416666666666667*5)/(16*2.89*0.833333333333333*0.002*0.5)
Evaluating ... ...
PR = 5.40657439446367
STEP 3: Convert Result to Output's Unit
5.40657439446367 Cubic Meter --> No Conversion Required
FINAL ANSWER
5.40657439446367 5.406574 Cubic Meter <-- Pay Ratio
(Calculation completed in 00.020 seconds)

Credits

Created by Suraj Kumar
Birsa Institute of Technology (BIT), Sindri
Suraj Kumar has created this Calculator and 2200+ more calculators!
Verified by Ishita Goyal
Meerut Institute of Engineering and Technology (MIET), Meerut
Ishita Goyal has verified this Calculator and 2600+ more calculators!

10+ Compaction Equipment Calculators

Thickness of Lift given Compaction Production by Compaction Equipment
Go Lift Thickness = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Efficiency Factor*Roller Speed)
Ratio of Pay to Loose using Compaction Production by Compaction Equipment
Go Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
Efficiency Factor using Compaction Production by Compaction Equipment
Go Efficiency Factor = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio)
Width of Roller given Compaction Production by Compaction Equipment
Go Width of Roller = (Production Due to Compaction*Number of Passes)/(16*Roller Speed*Lift Thickness*Pay Ratio*Efficiency Factor)
Speed of Roller given Compaction Production by Compaction Equipment
Go Roller Speed = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Lift Thickness*Pay Ratio*Efficiency Factor)
Number of Passes given Compaction Production by Compaction Equipment
Go Number of Passes = (16*Width of Roller*Roller Speed*Efficiency Factor*Lift Thickness*Pay Ratio)/Production Due to Compaction
Compaction Production by Compaction Equipment
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor*Pay Ratio)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Excellent
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.90)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Average
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.80)/Number of Passes
Compaction Production by Compaction Equipment when Efficiency Factor is Poor
Go Production Due to Compaction = (16*Width of Roller*Roller Speed*Lift Thickness*Pay Ratio*0.75)/Number of Passes

Ratio of Pay to Loose using Compaction Production by Compaction Equipment Formula

Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor)
PR = (y*P)/(16*W*S*L*E)

What is Compaction Equipment?

Machines, such as rollers, to expel air from a soil mass and so achieve a high density. Smooth-wheel rollers are best for gravels, sands, and gravels-and-clay soils with reasonably high moisture contents.

How to Calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment?

Ratio of Pay to Loose using Compaction Production by Compaction Equipment calculator uses Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor) to calculate the Pay Ratio, The Ratio of Pay to Loose using Compaction Production by Compaction Equipment is defined as the ratio of pay to loose when other parameters are known. Pay Ratio is denoted by PR symbol.

How to calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment using this online calculator? To use this online calculator for Ratio of Pay to Loose using Compaction Production by Compaction Equipment, enter Production Due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Efficiency Factor (E) and hit the calculate button. Here is how the Ratio of Pay to Loose using Compaction Production by Compaction Equipment calculation can be explained with given input values -> 5.208333 = (0.0416666666666667*5)/(16*2.89*0.833333333333333*0.002*0.5).

FAQ

What is Ratio of Pay to Loose using Compaction Production by Compaction Equipment?
The Ratio of Pay to Loose using Compaction Production by Compaction Equipment is defined as the ratio of pay to loose when other parameters are known and is represented as PR = (y*P)/(16*W*S*L*E) or Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor). Production Due to Compaction is the exertion of force on something so that it becomes more dense, Number of Passes required to obtain the required compaction depends on the lift thickness, contact pressure, and soil moisture content, Width of Roller is the smaller dimension of the roller , Roller speed is the speed by which the roller is rolling over the surface, Lift Thickness governs aggregate size & The Efficiency Factor is the relationship between the allowance time and the time taken.
How to calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment?
The Ratio of Pay to Loose using Compaction Production by Compaction Equipment is defined as the ratio of pay to loose when other parameters are known is calculated using Pay Ratio = (Production Due to Compaction*Number of Passes)/(16*Width of Roller*Roller Speed*Lift Thickness*Efficiency Factor). To calculate Ratio of Pay to Loose using Compaction Production by Compaction Equipment, you need Production Due to Compaction (y), Number of Passes (P), Width of Roller (W), Roller Speed (S), Lift Thickness (L) & Efficiency Factor (E). With our tool, you need to enter the respective value for Production Due to Compaction, Number of Passes, Width of Roller, Roller Speed, Lift Thickness & Efficiency Factor and hit the calculate button. You can also select the units (if any) for Input(s) and the Output as well.